Suffolk County Council S278 Agreement

The document is prepared by the lawyer of the local highway authority and issued to the developer`s lawyer in the form of design. The details of the agreement will then be agreed before the final document is finalized and signed by both parties before the start of field work. Conditions for the person to pay all or part of the cost of the work that can be fixed or fixed in accordance with the agreement. To apply for a Section 38 agreement, please download the full S38 licence application form and complete it (Word, 58KB – Updated on 28.05.2020). Fill out the form electronically to make sure your application is as clear as possible and send it as a Word document (an electronic signature is acceptable). Please also provide supporting documents and plans electronically, if necessary due to file size, either zipped or with a cloud link, z.B Dropbox. Here you can find information on agreements with the Secretary of State for Transportation under Section 278 of the Highways Act 1980. For assistance to Section 278 agreements, E-Mail-roadagreements@hants.gov.uk “A motorway authority, if it ensures that it will benefit the public, an agreement with each person – The details of agreement regarding the requirements of the local highway authority and developers are to ensure that the proposed work is carried out in accordance with the approved drawings. It also explains how local road authorities can act if the developer is unable to complete the work. If the access model is either by simple drawings, if the applicant provides or is provided by the use of standard SCC drawings, this licence must be approved: the developer is required to provide the local road authority with information in order to assist in the preparation of Section 278 of the agreement, for example.B.: according to the road authority responsible for the roads concerned, an agreement of Section 278 is required either with the Secretary of State for Transport or with the local authority responsible for road traffic.

. Section 278: Developer Guide (updated October 2020) provides developers and their advisors with all the information they need to submit a full Section 278 submission for design review. The transmission of complete packages allows the design control team to quickly process design tests.